December 6, 2018

It's the Final Countdown

Things were really moving on the house before Thanksgiving. In our weekly email update, our PM shared that he would be on vacation for the holiday and provided the contact information for another PM in the community in case we had any questions. With that in mind, we drove by the house over the weekend to see if there were any changes.

December 3, 2018

Weeks 8 and 9 of Construction

Back to construction updates. Moving back to the first full week of November (week 7 of construction), the drywall was hung, and the first coat of paint was completed. This might sound stupid, but it’s amazing how different a house can look with drywall. You know, with real walls… Anyway, here are a couple of photos from our PM from the inside.

November 29, 2018

Big Changes Inside and Out

After our pre-drywall meeting on Oct. 25, we received our usual update from our PM. He shared that the house passed all inspections (we knew this because all inspections must be passed before the pre-drywall meeting), and insulation began. In the photos below, you can see the drywall laying in the house. This was being delivered when we met with our PM.

November 18, 2018

Pre-Drywall Meeting

Inspections were completed at the beginning of week 5 of construction, and we were ready for our pre-drywall meeting by Thursday, Oct. 25. This was an opportunity to meet with our PM and discuss any questions or concerns we have so far in the process. We walked through the house and looked at every detail we could. Below are a handful of photos I took along the way.

November 15, 2018

And There's a House!

Ok, this is just ridiculous now… Going all the way back to the second week of October (one month ago!), the house was just basement walls. Since then, a lot of things have happened. When others have written that this process moves quickly, they were not kidding.

October 8, 2018

Rain, Mud, and Construction


Alright, here’s another entry of catching up.

Right after excavation on September 20, we received some rain, but this didn’t really delay things. Our foundation footings were poured before we visited the site on the 25th. I’ve read other Ryan Home builders comment that looking at the footings makes the house seem smaller than it actually is. Because it was so muddy, we didn’t walk around the space, so here’s a nice shot from the front.

October 5, 2018

Random Observations and Groundbreaking!

While waiting on Ryan Homes to catch up on finishing houses close to ours so they could move the red dumpsters, we visited the lot and saw that construction had begun on the space behind our house.

Here’s an original view:

October 1, 2018

Waiting and Pre-Construction


I’ve fallen behind already with posting the current happenings with our house. Let’s jump right back into it…When others have written about “hurry up and waiting” during this portion of building a house with Ryan Homes, they weren’t kidding. The first few weeks are a whirlwind of activity and decision making that the next few are a snail’s pace of nothing.