November 18, 2018

Pre-Drywall Meeting

Inspections were completed at the beginning of week 5 of construction, and we were ready for our pre-drywall meeting by Thursday, Oct. 25. This was an opportunity to meet with our PM and discuss any questions or concerns we have so far in the process. We walked through the house and looked at every detail we could. Below are a handful of photos I took along the way.

House Front
Front Door and Foyer

Hallway to Great Room
Guest Bath

Guest Bathroom Vanity Light and Vent
Hall Closet

Bedroom 1 Back Wall

Bedroom 1 Closet
Bedroom 2 Side Wall

Bedroom 2 Front Wall
Kitchen Pantry
Kitchen
Kitchen Ceiling and Lights
Owner Bedroom
Owner Bath Sink Plumbing
Roman Shower (and random beverages still there)


Dryer Vent
Washer Hookups
Basement Stairs
Basement Bedroom
Basement Bathroom
Basement to Storage Space
Storage Space

Other random notes of interest from our meeting:

On the washer hookup configuration, there is a red cover. This red cover is not a drain! It’s a common error.
On ceiling fan rough-ins, make sure to use the proper screws when installing units.
The LED ceiling lights are exceptionally bright. We’re hoping they are dimmable. 
Foam insulation provides a seal to prevent cold or hot air from moving into the living spaces.
Water lines and drains are run through the floors rather than in the walls to prevent freezing. 
You should never park a double axel vehicle on a concrete driveway; especially new concrete.
Our tentative closing is December 10! 

Estimated completion: December 10, around 47 days