Pre-Construction Questions Only


A copy of the questions asked/answered at the Pre-Construction meeting with our Project Manager and Sales Representative. 
  1. Communications procedures: 
  2. Preferred method of contact? 
  3. Turnaround time for responses? 
  4. How often will we receive updates? 
  5. Construction Timeline/schedule?
  6. Approximate completion date: 
  7. Visiting the construction site: 
  8. Will the Ryan Homes provided inspection results be available for review? 
  9. County inspection reports? 
  10. Bring own inspector: 
  11. What do you do to protect the materials and structure from weather while being built
  12. What are the dimensions of the lot so we can get estimates on the cost to build a fence? 
  13. How deep will the foundation be? 
  14. Where are the hose bibs
  15. Where will the air conditioner compressor be placed? 
  16. Where will the utilities enter the house/meters: 
  17. Standard outside lights and outlet locations? 
  18. Where will the gutters be and where/how will they drain
  19. Mailbox location
  20. Height of backdoor to ground
  21. Will any of the basement walls be exposed? 
  22. Is the garage partially finished?
  23. Is there a step from the mudroom to the garage? 
  24. What type of garage door opener will be installed? 
  25. Will the garage floor have a pitch or drain? 
  26. Where will the sump pump discharge? 
  27. Will there be an additional floor drain anywhere? 
  28. Location of water softener rough-in: 
  29. Will there be any exposed frame in the unfinished portion of the basement? 
  30. Where will ventilation fans be installed? 
  31. Vent to:
  32. Where are the bathroom towel racks, etc. placed? 
  33. Kitchen counter top piece against wall: 
  34. Refrigerator space size and depth: 
  35. Laundry space size and depth: 
  36. 3 or 4 prong dryer plug? 
  37. Dryer vent location: 
  38. Where will the attic access be located? 
  39. How much flooring in the attic? 
  40. How many vents? 
  41. Electrical service panel location: 
  42. Will the electrical panel be labeled? 
  43. How (1breaker/room)? 
  44. Outlet Voltage: 
  45. Kitchen island: 
  46. Placement of ceiling fan rough-ins: 
  47. Connection to switches: 
  48. Placement of light switches: 
  49. Placement of recessed/LED lights (traditional light package +basement): 
  50. Placement of light fixtures: 
  51. Type of heating and cooling: 
  52. How many zones/thermostat(s)? 
  53. Type of thermostat? 
  54. Where is the inside air handler located? 
  55. How many and where are the intake – return  locations? 
  56. How many and where are the output vents? 
  57. How is the subfloor attached? 
  58. Will there be extra floor supports for high-traffic areas? 
  59. Flooring breaks/carpet-vinyl transition: 
  60. Drywall tacked, screwed, or both? 
  61. lls smooth or textured/brush stroked? 
  62. Paint finish: 
  63. Will the windows have screens installed? 
  64. Will the backdoor have a screen? 
  65. Where will there be smoke detectors and carbon monoxide detector be in each room? 
  66. Leave floor covers so we can use while moving in? 
  67. When can we receive info and model #s for: 
  68. What type of roof? 
  69. What is the type of siding? 
  70. Do any of the options I choose give you cause for concern? 
  71. How long have you been with Ryan Homes
  72. How long have you been doing project management? 